ONGOING PROJECTS

Construction of Academic Block-C For 1500 Students

  • Three story building with total 68,000 sft floor area
  • 24 Class rooms, 4 lecture halls theatre type
  • Faculty & administration offices
  • Computer Labs, sciences labs and a general library
  • Equipped with 2 numbers of lift elevators
  • Total estimated cost is 154 Millions
  • Completion period: June 2022

-Construction of Academic Block-A For 4000 Students

  • Six story building with basement with total 180,000 sft floor area
  • 60 class rooms, 4 lecture halls theatre type
  • Faculty & Administration offices
  • Computer lab, sciences labs & departmental library on each floor
  • Lift elevators for students and staff
  • Total estimated cost is 989 Million
  • Completion period: March 2024
  • INCOMING PROJECTS

Tendering and bidding processes for the following projects have been completed.

Construction of Administration Block

-Construction of Faculty & Staff Hostel

-Construction of Girls Hostel

  • EXISTING BLOCKS- REPAIR & MAINTANANCE WORKS

Routine repair, maintenance works, and installation are continuing based on departments’ requirements, need based & emergency works. The current facility consists of the following components:

  • One Academic Block
  • Staff/faculty Hostel
  • Boys Hostel cum Admin Block
  • Girls Hostel