Engr. Mohammad Anwar Khan
Deputy Director Works
ONGOING PROJECTS
–Construction of Academic Block-C For 1500 Students
- Three story building with total 68,000 sft floor area
- 24 Class rooms, 4 lecture halls theatre type
- Faculty & administration offices
- Computer Labs, sciences labs and a general library
- Equipped with 2 numbers of lift elevators
- Total estimated cost is 154 Millions
- Completion period: June 2022
-Construction of Academic Block-A For 4000 Students
- Six story building with basement with total 180,000 sft floor area
- 60 class rooms, 4 lecture halls theatre type
- Faculty & Administration offices
- Computer lab, sciences labs & departmental library on each floor
- Lift elevators for students and staff
- Total estimated cost is 989 Million
- Completion period: March 2024
- INCOMING PROJECTS
Tendering and bidding processes for the following projects have been completed.
–Construction of Administration Block
-Construction of Faculty & Staff Hostel
-Construction of Girls Hostel
- EXISTING BLOCKS- REPAIR & MAINTANANCE WORKS
Routine repair, maintenance works, and installation are continuing based on departments’ requirements, need based & emergency works. The current facility consists of the following components:
- One Academic Block
- Staff/faculty Hostel
- Boys Hostel cum Admin Block
- Girls Hostel